Each of the following video clips were recorded by me, Mark Daynes, and are designed to show ‘something interesting’ using Oracle Analytics Cloud (OAC) in a very short time period, typically around a minute. Most examples are focused on visualizations elements. Whilst these were created using OAC, a lot will also apply to Oracle Analytics Desktop
Examples 1-16 were created using the January 2022 version and all others were from the latest version applicable at the time.
1. Make mine a skinny donut

The video below shows how we can quickly tweak a donut chart to make it skinny.
2. Make a data point stand out

In the video below we make a data point near Newcastle stand out by changing its colour and also its shape so that it is a bright cross and thus distinctive.
3. Using a Visualization as a Filter

In the video below we create a visualization and then create a table visualization and use the table to filter the results.
4. Quickly view data at a relative time to today (e.g. last 6 months).

In the video below we create a new relative time filter so we can filter the data in the chart relative to todays date.
5. RAG Status Colour Coding

In the video below we apply a RAG status to data in a table.
6. Multi-Select and Change Common Properties of Selected Visualizations

In the video below we select multiple visualizations and then change some common properties simultaneously.
7. Zoomable, auto-focus map, controlled by second visualization

In the video below we create a map visualization and then create a trellised view and filter the map by the trellis and show zooming in action.
8. Trend Lines, Reference Lines and Forecast

In the video below we will add various reference lines such as median, maximum and minimum and then add a polynomial trend line and then add a forecast.
9. Natural Language Generation

The video below shows the creation of a chart which we then duplicate and the visualization is then changed to provide a Natural Language interpretation. We then go a step further and add a second metric to the NLG visualization.
10. Auto Insights

The video below shows the OAC auto insight generation in action. It creates suggested visualizations based on the dataset and allows them to be selected and used in the workbook.
11. Adding a Note and Linking to Data Points.

The video below shows us creating two visualizations in Oracle Analytics Cloud (OAC), adding a new note and then linking the note to datapoints in the visualizations. Thus, when we are presenting this workbook, the viewers can see the comment and the data points to which it applies.
12. Using the Data Quality screen to review data and set location columns.

The 2 min video below shows us creating a new data set in Oracle Analytics Cloud (OAC) from a table in an autonomous database. We then review the data using the data quality screen and see how certain items are distributed. We perform some filtering to examine the data before we toggle the latitude and longitude columns to be attributes and indicate that they are location columns prior to us using them in a new workbook.
13. Data Action ‘in action’

The following video shows the creation of a ‘detail’ canvas, a ‘master’ canvas and a Data Action to navigate from one to the other passing context upon which to filter the detail.
14. Sentiment Analysis and Binning – Adding value with a Data Flow.

The following video shows a simple example of how we can use a dataflow to add additional content and value to a dataset. There’s a lot of options, including invoking machine learning models, but here we just show a couple such as Sentiment Analysis and also put the sales figures into some bins and then we take this augmented data and visualise it.
15. Custom Backgrounds

The following video shows the assignment of a custom background image, (which can be used for presentations, infographics, etc), making the canvas freeform and adding a new example visualisation.
16. Use “Search Everything” to Explore Indexed Datasets.

The following video shows an example of using the ‘Search Everything’ bar to visualize indexed dataset data.
17. New Dashboard Filter Bar in Action

The following video shows some of the basic new features of the Dashboard Filter Bar in action (and we are using the March 2022 version of the Oracle Analytics Desktop here). This component acts as a way of grouping dashboard filters together so they can been seen as a logical unit. Here we see the ordering of the filters set, the background of the bar being customised, ‘Apply’ and ‘Reset’ buttons applied and the orientation of the bar changed. Auto dependency is used between each filter.
18. Persistent right-click calculations
Added 30th May 2022

The May 2022 version of Oracle Analytics Cloud introduced the ability to ‘Persist right-click analytics calculations’ so when creating Outliers or Clusters by using the right click and create statistics, these ‘persist’ in the visualization and are able to be made into custom calculations and re-used.
In the example video below, we take a years worth of sales figures, shown by month, for four sales people. To help us analyze these figures, we use clustering to see how the sales data for each sales person is distributed. We then create a new cluster calculation and duplicate it and make some tweaks to change the K-Means clustering value from 5 to 6 clusters and then show how we can quickly and easily use this in a new visualization. All under 2 minutes.
19. Overlay Charts
Added 17th July 2022

Overlay Charts were introduced into the July 2022 versions of OAC and Analytics Desktop. We can use overlays to build multi-layered visuals whilst also being able to control the transparency of each layer. When layers are added, they default to the Y-axis, but where there is a need to do so, we can also use a secondary Y-axis. In this example, we create two line charts and then a third, a bar chart that needs to use a secondary Y-axis where we also tweak the transparency to de-emphasize the focus on the bar chart.
20. Composite Cards
Added 18th Sep 2022

Introduced in the September 2022 release was the concept of composite cards. Now we can add a tile to a visualisation and include up to three measures whilst having some control over both the layout and sizing properties of each measure. In my example I take what is already what I consider to be a ‘composite visualzation’ of the Overlay Chart and further enhance it with summary metrics at the top. So, in one visualization we can see the interplay between the Forecast and Actual sales as line charts, the number of customers we have on a monthly basis that underpin the sales, and now we have totals for the year for the Number of Customers, with the Forecast and Actuals clearly displayed on the top as primary and secondary measures.
21. Custom ‘No Data Found’ Message
Added 9th Oct 2022

The default message when a visualization returns no data is simply ‘No Data Found’. In the September 2022 release we can now change this to a custom message by toggling a new workbook setting. In the example below we show how to set this, sarting with a visualisation that does actually return data and then giving it an expression filter that is so restrictive as to return no data. Note the granuality; this is not sensitive at a visualisation or a canvas basis, this is a workbook property.
22. New Filter Bar
Added 9th Oct 2022

The new Filter Bar provides a lot of new context sensitive filtering to the components that are simply dropped into it. This facility gives us some really easy access to a range of filtering options that are item type specific. In the short example below we create an analytic from scratch and also add in some new tiling so we can see a few metrics as well. We then apply a numeric filter and then show how this can also be individually disabled too, then we add a date filter before clearing all filter values.
23. Export to Excel with Formatting (Preview).
Added 4th Dec 2022

In this video we show the new (preview) feature from November 2022 of exporting to Excel with formatting. In just a minute and 40 seconds we create a new visualization, we add a grand total and format that. We then order from high-low sales and then add some RAG status colouring to highlight the clusters of highest achievers, mid range and low achievers. We then use a new feature to rename a column in the output to something different than the default from the subject area. We then take all this and export to Excel and see how we retain that formatting.
24. Sliders
Added 4th Dec 2022

Intoduced in the November 2022 release, sliders provide us with some interesting interactivity. Here we create a new visualization and apply a time based slider to see the change in income over time. We take a date field and tweak it to act as a slider to show the change in income on a week by week basis and play that back at a high speed setting.
25. Re-purpose an Auto-Insight Generated Calculation
Added 6th Dec 2022

Auto-Insights are super useful for providing some really interesting insights into the data. Quite often they also provide some innovative calculations to support the visualisation they suggest, and so I recommend having a look at these as they often provide some useful inspiration for other ideas. In this short video below, we see a ‘Top 10’ analytic being created based on one metric which performs a ranking by that metric and then creates an ‘others’ section. We take this calculation, duplicate it and then change the measure from the count of flights to the sales value and then rank the sites into the top 5. We then duplicate the visualisation and replace the original calculation with our new one. We still have some visual tidying up to do with titles and axis, but in under 2 mins we get a lot of additional value from the calculation provided by Auto-Insights.
26. Custom Sizing of Location Points
Added 12th Feb 2023

The January 2023 release of OAC provides the ability to change the size of the location points. The video shows how to simply do this so that they can be set to a size appropriate to their density. In this release, the Property panel is now adjacent to the Grammar panel and is easier to navigate.
27. New Tile Visualisation
Added 12th Feb 2023

Oracle OAC January 2023 introduced a new tile visualisation which has more flexibile features than the original, which is now shown as deprecated. In this short video we show the creation of a new tile for a main measure of “Sales Values”, for which we create a custom title and tweak the font size and also the size of the measure value. We then choose a “centre-centre” layout and then add in two more secondary measures and set their values to a custom size. Finally we apply a pre-existing conditional format to the tile.
28. Make It Snappy
Added 26th Feb 2023

The Jan 2023 version of Oracle Analytics introduced the “Snap to Grid” functionality to provide further visualization layout and alignment capability. Once the canvas is toggled into Freeform mode then we can set up the grid size to our needs, make the grid visible and then align visualization objects to the grid.
29. Can You Explain That To Me?
Added 26th Feb 2023

Explain functionality in Oracle Analytics Cloud provides machine learning generated insights on specific attributes and measures that can be used as visualizations and filters in our projects. Explain’s output is subdivided into four different sections : Basic Facts, Key Drivers, Segments and Anomalies. In the following video we select a column (Sales Item) and run Explain on it to examine some of the generated insights. We then select some of the generated visualizations to use in a project. Starting with the basic facts, we let explain give us the basic information about the Sales Items so we can quickly see the various Sales Items we have and how they compare to each other in relation to the metrics available. Next we pick the Key Drivers and see how the Sales Items corrolate to outcomes. We then look at Segments, which runs a classification algorithm for the attribute being examined and allows us to set a variable number of segments to be generated across selected attributes/measures in the dataset to determine key intersections. When segments are added to a project they create a new custom calculation, which can be examined and then added as a filter to include or exclude data related to that segment.
30. Combining Multiple Techniques
Added 5th March 2023

The prior videos have tended to focus on single things “of interest”. In this short video we show a number of techniques combined together to create a data story using sample data of balloon pilots flights over time. Firstly we create a detailed data canvas showing sales per pilot in a graphical format and then copy that visualization to display it in a data table colour coded by pilot with a grand total. We then select both visualizations, where Oracle Analytics shows us the shared properties of the selected objects we can change which will affect all selected objects. Using this feature we hide the legend to maximise the visualization real-estate. We then create a second canvas to show sales by pilot and then duplicate that visualization to show by a another measure, the number of flights. We then create a dashboard filter and use the facility provided by Oracle Analytics with date fields to change the granularity and choose a weekly view. Tweaking the layout, we create a slider of all of the weeks and then hide the grammar panel to maximise the layout and set the slider to display the details of sales and number of flights for all pilots on a week by week basis. Then we create a data action to connect the visualizations to the details canvas we first created, passing all values. This allows us to focus on the pilot and sales during the week in question we are viewing. We then show this drilling to detail action for both visualizations we have. In just a very short 3 minutes we show how easy it can be to create really responsive visualizations without any coding to analyze data.
31. Shadow Outline to make visualisations “pop”.
Added March 26th 2023.

The March 2023 release of Oracle Analytics gives us further enhancements to the layout, including the ability to specify shadow properties.

In this example we create 4 tiles and tweak the font sizing and add some background colour and then select a shadow style to give the tiles some extra visual “pop”. In the video the method used to quickly duplicate the visualisation once we have it in the format we desire is ctrl-c to copy it and then ctrl-v to paste it. We can then simply change the metric to rapidly build a suite of tiles in the same format.
32. Annotations and Formatting Together
Added Jun 10th 2023

The May 2023 release introduced the concept of annotations within conditional formatting. In this very short sub 2 minute video we create a new visualization and add both conditional formatting to highlight underperforming sales figures and then add an annotation to provide additional contextual information, which is really useful when creating a data story for presentation.
33. Binding Parameters
Added August 20th 2023

We can now bind parameters to filter results, so that when a filter is set the parameters are also set and can be used in multiple places. In the following short video we show a “Region” filter being created and then a new parameter is created and bound to the filter. As an example we set the title of one of the analytics to dynamically show the Region filter values by embedding the bound parameter in the title.
34. Enhance Tiles with Spark Charts
Added August 23rd 2023

Spark charts are a super visual enhancement to add to tiles as we can see the movement of the measure over time and be alerted to any peaks and troughs. In this short video we start with a blank canvas and create tiles and format them before adding on a Spark chart and then cycle through some of the options that are available to us. We then show how easy it is once we have a tile created to duplicate and tweak for other measures to have the same look and feel.
35. Line Style Manipulation
Added December 1st 2023

On occasion we want to be able to show multiple lines on a chart and provide emphasis on some and put some into the background for context and reference. A new facility appears in the November 2023 release allows us to do just that. Using a combination of new properties we can change the transparency, width and style (sold, dotted, dashed, etc) of the lines. These new tools allow us to tweak the emphasis so our visualizations fit with the gestalt philosophy of “figure/ground”. In this short video we create an analytic showing material costs and labour costs for factory maintenance and we wish to have the maintenance costs blend into the background and have the item costs in the foreground. Watch what happens to the labour line when we change the new parameters.
36. Custom Point Sizes Everywhere
Added 2nd December

In video 26 we looked at the ability to change point sizes for location specific data. The grammar panels have now been enhanced to allow us to the change point sizes across multiple visualisations. In this short video we show how to make the points in a scatter sensitive to a measure value, and then provide some control over the size of those points. We also add an outline to the points. We then duplicate the visualisation and tweak to create line charts and show the points being resized here too.
37. Create a Card Deck in minutes
Added 3rd Dec 2023

Combining a number of techniques we can :
- Get Auto insights to suggest a range of different visualizations by interrogating the dataset and using AI to create a suite of visualizations for consideration.
- Select a few of these and allow the layout editor to auto-size the visualizations.
- Multi-select a number of these visualizations and change the border, shadow, etc to give them an appearance of “cards”
- Add in a couple of new Tiles for the Labour and Material Costs and show the costs for each over a period of time and make them also appear as cards and give them a distinctive background. Also change their default titles to be something quite specific.
- Revisit the other “cards” in the “deck” and give them a more subtle background to distinguish between the tiles and the other visualizations.
The aim of this example is to show that in a few clicks, and without any coding, we can combine a number of techniques to create deck of analytic cards against a data set in a very short time.
38. Banding
Added 13th Jan 2024

We can now create visual “banding” on analytics to draw attention to specific areas of a chart. This is a development of the reference line statistical functionality, whereby we can create a reference line and select a range of date values to highlight. We can then set the transparency, colours, to suit our requirements to finesse the look and feel.
39. Annotate Tables with Icons
Added 15th Jan 2024

A new extension of conditional formatting allows us to specify icons and emojis that can be displayed in the tabular reports. In the following video we show how to do this from scratch in a minute and then also apply some shading. We have a table of monthly sales data and can use icons and some subtle colouring to highlight the months where the sales dipped according to the prior month. These visual cues focus our attention to the data elements that are important to us. The “down arrow” adds meaning indicating the trend of the sales more so that just the shading which acts to draw our attention to the items we need to look at. We do not need anything to indicate that sales went up, as we can assume that they are fine from the fact that they are not brought to our attention. Thus we reduce any visual noise and see the data we are interested in with minimal cognative load.
40. Emojis on Tiles
Added 10th March 2024

In the March 2024 release, we build on the formatting shown in Video 39 with icons and emojis being assigned to Tiles. Previously, whilst “RAG” (Red, Amber, Green) colour coding can be applied through conditional formatting, we can now assign other visual cues such as Icons and Emojis to tiles. Deuteranomaly is the term for Red/Green colour-blindness, so having other visual cues in addition to colour coding can be significantly useful. In the following short video we show the above tile being developed from scratch.
41. Range and Relative Time Filter Parameters
Added April 14th 2024.

Building on the parameters we looked at in Video 33, we can now easily bind parameters to date range and relative time filters. See here in the manual for details on binding parameters to filters. In this example we create a new analytic to show the sales of books of different types across a couple of years. We add in a column filter so that data can be filtered by the book type. Then we can drag the sales date to the filter section of the analytic. Then we can see the various range options, such as Relative Time and Range. Selecting range, we can then create and bind a “start date” parameter and “end date” parameter and bind them to the start and end dates of the ranges. It is then a simple process to drag these new parameters to the filter bar and this will allow us to enter start and dates. Combined with the column filter we can interrogate the book sales by a range of dates for different book types.
42. Inline Filters
Added May 8th 2024

In the May 2024 release, there is the ability to add filters that appear as checkboxes (for multi-select) and radio buttons (for single select). This works best when there is a relatively small number of options as otherwise they can take up too much screen real estate, the users spends longer search for the options and also there are limits to the number that can be shown. For a small number of options and for quick access this is an excellent option. In the following video we load up some data of star rating for delivery drivers. In this example they all have ratings ONE, TWO or THREE.

We will create a visualisation of the data and then add a standard list filter for the ratings and see that in action. What we then do is to change this to the new “InLine” type with checkboxes for multi select, then change to radio buttons for single select. We then toggle from horizontal to vertical layout.
43. New Sankey Chart
Added August 19th 2024

The July 2024 release provides enhances Sankey diagrams. The short video below looks at a small data set that shows sales for products that are categorized. Putting this into a Sankey Chart automatically shows us the sales people, the items they are selling and the categories they belong to. Using new functionality, we can adjust many parameters such as widths and gaps to get the layout the best suits our data. One really useful features is the ability to group by column or value. In the example above we group by “value” so that we can see the sales for the groupings. The new Sankey chart is a much improved representation that the one available previously and is well worth evaluating where you have categorised data.
44. 100% Area Charts
Added September 1st 2024

The 100% Area chart is not a new visualisation, but it is not seen very often. In this video we start by creating a new bar chart visualisation then add a top 20 filter so that we can see the highest spending suppliers. Including the invoice date we can segregate data by colour, we then set it to show the data on a year by year basis. Then we switch up the visualisation to a 100% Area chart so that the year on year relevant contribution is evident. We can then set the line type to a smoother style and add in the data viz points to allow us to easily hover over them to see the actual values that we are interested in. Further, we can take that year field and use the right-click functionality to add it as a filter.
45. Automatic Date Differences
Added October 15th 2024

The September 2024 release of OAC added a really useful new feature for people using data sets, and that is the automatic data difference computation. In this example we take a data set of car sales and use this new facility to help us to calculate the difference between the order date and the delivery date of the cars ordered without any coding at all, which is a great feature for users who just want to see their data. We can then use the auto-insights feature of OAC to create some visualizations of the data in order to quickly see the forecast of differences between order and delivery dates, as well as the customers with the longest waits.
As the AI assistant is being rolled out across OAC instances (starting with those with high cpu shapes) we can index this new dataset and show the AI assistant in action, in addition to the “auto-insights” that we used in the video above. To see more about the AI Assistant, please check out my article here.
Firstly we need to index the dataset so that the AI assistant can be trained on the data and make it ready for use.

We can now ask the AI Assistant questions and get visualizations which we can add to the workbook.

Here we ask for the “top 10” durations – and we can see they are all very similar apart from one outlier. We then ask for that as a pie and add both to the workbook. It’s a simple case, but a different approach to the auto-insights that uses AI to create a bunch of suggested insights controlled by the parameters we set, here we are asking “natural language questions” of the data to get insights.
46. Contextual Insights
Added Jan 7th 2025

Contextual insights are superb for showing your selected data in context of all the other data you haven’t selected. In this 8 minute video (with sound) I show a dataset and build a workbook using Insights, AI Assistant and then invoke the new Contextual Insights option. It is a lot richer than I show here, but this provides at least a taste and shows how it can be invoked whilst also discussing Insights and AI Assistant generated visualizations. As a bonus we even look at a custom calculation that is generated and how that can be tweaked, duplicated and used in our own analytics.
47. New Gauges
Added 12th March 2025

Gauges were added in the March 2025 release of Analytics. Gauges are a really effective visualisation for comparing progress or how close to a target something is. In the short video below we create a “trellis” of gauges showing the actual sales figures of 3 products compared to their targets. We change the style of the gauges and set a custom colour for the ticker.
48. On Click Actions
Added March 25th 2025

One great feature added in March 2025 is the ability to have “on click actions” on columns in tables. We may have summary data and wish to click to drill to some more detail, and we can do that using the new On Click Action facility. In the screenshot above we have a table of products and by clicking each one, we call a data action to pass the product name to a detailed analytic. This provides a more seamless way for the user to interact with the data as the hyperlink provides the visual cue that the coloum is clickable. In the short video below we see this in action, from the development of the analytics to the adding of the data actions and the toggling of the on-click action facility from the calling analytic, which then navigates to the detailed analytic. We have a number of different ways of navigating – new tab, etc but we choose to surface the detailed table in a popup and see what happens when we pass the anchored value of the product.
49. Hiding Items
Added April 21st 2025

The Jan 2025 release included a super useful facility to hide items. Previously if we wanted to say order by a specific item they had to be included in the visualisation and be seen. Now, we can choose to hide items and still make use of them. This is particularly useful if we don’t really need to see that item and were just using it to do something like ordering. Now as we can hide items we can make the visualisations even more compact than before. Note that when you hide the column it does not affect the granularity of the associated columns. To show this in action, we create a simple table visualisation of 3 columns, Sales Date, Product and Amount, then we decide that we want to just see the Sales Amounts and the Products and not see the Sales Date. We do this by quickly hiding the Sales Date and then show that we can still use this in ordering, noting that we still have the data at the same granularity as before – i.e. the sales values for the products are not aggregated.
50. Percentages in Pivots
Added April 24th 2025

There’s a really cool feature in OAC that allows us to create percentages of values in Pivot tables, with very little effort needed from the visualisation designer. In this video ( with Audio to explain the process ) I take a simple data set of products and sales amounts over time and create a pivot table where we also add some totals. Now we can select the sales amount column a second time and repurpose it to show the percentage of the spend rather than the spend value. What’s great about this facility is that we can have it showing the percentage spend related to various different elements, for example we may want to see the percercentage spend of each spend element compared to the sum of all spend values in the pivot. In this example we look at that and then choose to see it for each product, so for each product, for each day, we see the %age spend contribution.
51. Custom ToolTips
Added April 28th 2025

By default, OAC shows the datapoints in context as a tool tip. These can be completely customized, so we can add or remove data elements, create more descriptive narratives and change formating and even reference parameters. In the video (no audio as it is self-explanatory) we start with a default tool tip and then create a much more formatted version as we show in the image above to show how custom tooltips can be utilised so that you can emphasize specific items and layout each ToolTip for each visualization in a style that suits that specific visualization.
In order to reference a parameter, we need to do it using the @parameter syntax. For example, to show the current data we can add in @parameter(“Current Date”).
52. AI Dataset Description Generation
Added 30th April 2025

The May 2025 version of OAC has a new AI feature that interrogates data sets and creates a suggested description of that data set. This can be used for existing data sets where perhaps no ( or limited ) descriptions have been added previously, as well as a creating a really useful, or at least a default description that can be edited.
53. Parameter driven reference bands.
Added 28th May 2025

OAC now allows for reference lines and bands to be associated with parameters. In this 5 min video we create a line chart of orders by dates, and then create a reference band between two parameter driven dates to allow us to highlight spans of time that are of interest, all driven by drop down parameters.
54. Dynamic Lines
Added 20th July 2025

New in the July 2025 release, the Dynamic Lines is a fantastic visualisation to show directional flow between geographic points. In the example video below we have a simple dataset with a single source point and 3 destinations. We have a lot of control over the look and feel, so we show how to change the colour and shape of the lines and also add in directional arrows. We can add in additional detail, but the purpose of this is to show how simple it is to create dynamic lines using just geo data. Note the sample data set I created just has Latitude and Longitude co-ordinates that are set as attributes.
55. New Language Narratives (July 2025)
Added July 23rd 2025

In the July 2025 release, the Language Narrative has been given a refresh, so in this video (with sound – so that I can provide my own narrative) we create a little butterfly chart and associated narrative for it and look at some of the enhancements – including new tones, such as “Casual”. Whilst doing this we also make use of the new floating toolbar enhancement, so editing is even quicker.
56. Buttons

The September 2025 release of OAC brought the ability to display customizable buttons which can be an effective visual way of allowing users to take action. In this short example video we create a visualisation then add a button bar and create a custom button called “Loved Customers”. We then create a data action and configure the button to call it, drilling into a detailed popup. We could have a selection of buttons for common actions, drilling to different visualizations and providing the user an easy to understand and use interface.
57. Gantt Charts

The November 2025 release brought us Gantt chart. In this 2 minute video we take a look at some data and build a Gantt analytic with parent/child relationships, add some colour to distinguish between phases and then add a tile to show the number of days.
58. Column Switching
Being able to toggle the columns in an analytic can be really useful as it saves a lot of space (aka “Screen real-estate”) as you can have a single analytic that can show different columns on the X and Y axis. You can change the columns on the X and Y axis to really focus the data you want to see when you don’t want to see all the metrics on the chart at the same time. This was a feature of the “classic” interface and was possible prior to the November 2025 DV interface by using a combination of prompts and calculations, but now there is a really simple way of achieving this.

In the bar chart above I am showing the total value by customers. However you can see that when I click on the Y axis I can toggle that to Value Delivered and Value Cancelled.

The current documentation doesn’t mention tables, but as we show above, it is possible to configure them to by dragging a column to the “color” section which invokes a legend. Now when we click on the value ordered in the legend I can also toggle the metrics.
In the video, which is under 2 mins, we create a visualization from scratch and show how to make the analytic sensitive to column switching and set it up and show it in action. What is really great about this facility is the user experience – when users run the workbook they have access to much more flexible analytics.
59. Filter Groups
Added 29th Dec 2025
Filter Groups came in as part of the November 2025 release and is something that has a couple of real benefits – not only combining filters ( as the name would suggest) but also re-use. Rather than having a bunch of individual filters, you can bundle them into logical groups and treat them as reusable objects.

Filter groups let you take a set of related filters, and in the example I use in the video at the end, it was a certain selection of regions and only the highest performing ones, so rather than have those filters separately, I can combine them so they behave as a single unit. Once created, the filter group can be dropped into the new “Shared Objects” folder in the workbook and reused in other visualisations based on that workbook. This really helps with consistency.
Filter groups can be used just like regular filters, so in the filter bar, at the canvas level, or even on specific analytics. However CURRENTLY (December 2025) this is a preview feature, so you might need to set the “Enable Shared Filter Groups in Workbooks” in the console as I had to in order to enable it.
So, in summary, filter groups give you two things (1) They let you bundle together filters and (2) Share and re-use complex filter logic across any workbooks in the dataset (or subject area) in which the filter is saved.
60. AI Agents
Added 18th Jan 2026

The Jan 2026 version of Oracle Analytics introduced AI Agents as a native component. In this video, which is notably longer than the others at nearly 8 minutes, we look at a dataset comprising of calls outs to fix assets in a factory. We then create a new AI Agent and link it to the dataset so that it can answer questions in natural language of that data. In addition, we create a document to describe some rules we have for assessing non-scheduled maintenance faults in the factory. We can associate this document with the agent, so that it uses it in a RAG ( Retrieval Augmented Generation ) context.
During our interaction with the agent, we show that it can answer questions using Natural Language and then lean into some questions that require both knowledge of the data in the dataset of the maintenance activities and also the data in the document, and be seamlessly able to answer questions including
- Show me the number of breakdown events by asset name.
- Of these, does any asset meet the number of breakdowns for review?
- Which breakdowns include overheating?
- Show all the details for Electrical Panel West.
